Sink rough in plumbing

Discover Pinterest’s best ideas and inspiration for Sink rough in plumbing. Get inspired and try out new things.
25 people searched this
·
Last updated 10mo
the pipes are connected to the wall in the room that's under construction,

The “rough-in” building stage is when the plumbing fixtures and pipes are all lines are put in place, but they are not yet connected.Plumbing rough-ins, such as sink drains, are just one of many things inspected throughout the building or renovation process.Staying on top of everything and getting your sink drain rough-in to the correct height can mean the difference between passing and failing an inspection.So, what is the correct rough-in height for sink drains?A standard sink drain will…

147
pipes are connected to the floor in an unfinished room

A Quick Primer on Rough In Plumbing Rough in plumbing is, as its name suggests, basically a “rough draft” of your plumbing installation. The point is to get a diagram of your plumbing skeleton in place, a static and unchanging framework upon which you’ll complete your plumbing installation. This is beneficial because, once your …

22
an image of a room with pipes and numbers on the wall next to each other

See the drains & vents come together inside this bathroom. Includes pipe sizes for both major U.S. Plumbing Codes (IPC and UPC).

720

Related interests

Sink rough in plumbing and more

Explore related boards